2 Jul. 2012
0 minuten
22-jun 25-jun 26-jun 27-jun 28-jun 29-jun Loodprijzen Loco 1.792,00 1.793,00 1.768,00 1.744,00 1.769,00 1.796,00 $/ton 3-mnds 1.817,00 1.788,00 1.768,00 1.760,00 1.779,00 1.813,00
22-jun | 25-jun | 26-jun | 27-jun | 28-jun | 29-jun | ||
Loodprijzen | Loco | 1.792,00 | 1.793,00 | 1.768,00 | 1.744,00 | 1.769,00 | 1.796,00 |
$/ton | 3-mnds | 1.817,00 | 1.788,00 | 1.768,00 | 1.760,00 | 1.779,00 | 1.813,00 |